Lead Project Scheduler - Defence Industry (Mawson Lakes)
Lead Project Scheduler - Defence Industry (Mawson Lakes)
-
Mawson Lakes, Australia
-
Posted: less than a week ago
-
Save
Description
The prospect Saab Australia is an industry participant in the Combat Systems Integration
- Integrated Project Team (CSI-IPT) Collaboration Agreement (CSI-IPT CCA). The CSI-IPT CCA forms a collaborative enterprise organisation to execute scopes of work across Hobart Class Destroyer (SEA4000 Phase 6 and other related Destroyer Capability Enhancement (DCE) upgrades) and the Hunter Class Frigates (HCFs
- SEA5000 Phase 1). This will see independently executed programs such as SEA4000 Phase 6 and SEA5000 Phase 1 brought under one umbrella enterprise organisation, the CSI-IPT. The CSI-IPT will be built up with personnel from three industry participants and the Commonwealth of Australia (CoA) to form a collaborative team working across multiple programs to leverage synergies between platforms. The role As part of our Engineering and Sustainment Services group, the Lead Project Scheduler will be accountable for the effective development, update, and maintenance of the CSI-IPT Supplementary Production and Maintenance Schedules and associated performance measurement baseline. The Lead Project Scheduler will also contribute to the development and maintenance of process and policy level documentation relative to the Integrated Supplementary Schedule Environment. Further, the successful candidate will:
- Provide support, on-the-job training, mentoring, and leadership to junior scheduler(s) within the team.
- Develop and maintain the CSI-IPT Production and Test Team's Integrated Supplementary Schedule for Production, Test, and Maintenance related activities and Performance Measurement Baseline.
- Assist with the integration of the Production and Test Team's Integrated Supplementary Production and Maintenance Schedules into Project Controls and Tasking Statement Reporting Systems.
- Lead the analysis and reporting of Schedule Critical Path, Critical Activities and Milestones.
- Manage Schedule Health using CSI-IPT's schedule guidance (DCMA) and improve overall schedule health of production and test team's integrated supplementary production and maintenance schedules.
- Present reports for delivery performance, schedule adherence, resource capacity and resource utilisation.
- Responsible for the maintenance of the Production and Test Supplementary Schedules and Schedule Interfaces.
- Provide SME advice and guidance to a range of stakeholders with respect to scheduling activities.
- Support reporting activities, internal and external reviews in relation to EVM and Project Planning & Controls.
- Ensure compliance with industry standards, regulations, contract and organisational policies.
- Contribute to the continuous improvement of planning activities. Flexible work arrangements such as hybrid work from home / office and a 9-day fortnight will be considered for this role. About you Your skills and experience will include:
- Tertiary qualifications in either Project Management, Science, Business or Engineering discipline (desirable).
- Post graduate level Project Management qualifications or Cert IV Project Controls (desirable).
- Detailed understanding of PM methodologies and principles of project planning, scheduling and project controls.
- Working within a project-orientated organisation and ideally in a maintenance, production, or test environment.
- Exposure to EVM practices (desirable).
- Working in a Defence acquisition environment (desirable).
- Well-developed self-management skills and demonstrated ability to work under their own initiative to deliver outputs to time and quality.
- Team mentality is essential as they will be a requirement to lean in and assist other team members at times.
- Using PM software such as Open Plan Professional, Microsoft Project, and Cobra. Applicants must be Australian citizens and hold or be able to obtain a NV1 security clearance. Information including past and present nationality and citizenship may be requested to check eligibility for access to materials controlled under various export control regimes, including ITAR. About us Saab Australia is a defence, security and cyber solutions provider, specialising in the development and integration of major defence and security systems. For over 35 years in Australia, we have built a reputation for delivering complex systems integration projects that provide proven and advanced capabilities to keep us ahead of today's challenges. From combat, communications, security and underwater systems, to mixed reality, cyber security and deployable health solutions, our extensive portfolio of products and services provide high-technology solutions for defence forces and civil industries across the globe. Apply today to join our crew and deliver solutions with purpose! What you will be part of Explore a wealth of possibilities. Take on challenges, create smart inventions, and grow beyond. This is a place for curious minds, brave pioneers, and everyone in between. Together, we achieve the extraordinary, each bringing our unique perspectives. Your part matters. Saab is a leading defence and security company with an enduring mission, to help nations keep their people and society safe. Empowered by its 26,000 talented people, Saab constantly pushes the boundaries of technology to create a safer and more sustainable world. Saab designs, manufactures and maintains advanced systems in aeronautics, weapons, command and control, sensors and underwater systems. Saab is headquartered in Sweden. It has major operations all over the world and is part of the domestic defence capability of several nations. Read more about us here. Culture and benefits We employ over 1000 Australians and are committed to fostering a culture of excellence and enriching the employee experience. By joining Saab, you'll be a part of a collaborative and supportive organisation, where your professional growth and work-life balance are emphasised. You'll work within an innovative and vibrant workplace, while having the opportunity to develop a long-term, fulfilling career. As a valued team member of Saab Australia, you'll access a variety of perks and benefits to support you and your family including:
- 6 weeks paid leave each year
- 14% superannuation
- Free Income Protection Insurance
- Flexible working options
- Access to the Saab shares matching scheme
- Access to MySaab
- our online store offering everything from cash back at hundreds of stores to discounts from exclusive partners For further information about a career at Saab, visit the page adjacent: Applications Click 'Apply' to submit your CV and cover letter in support of your application. Kindly observe that this is an ongoing recruitment process and in exceptional circumstances, the position might be filled before the closing date of the advertisement. We encourage applications as early as possible to avoid disappointment. By submitting an application to Saab, you consent to undertaking workforce screening activities including, but not limited to, reference checks, Australian Federal Police check, verification of working rights and qualifications, sanctions screening and a pre-employment medical declaration. Saab Australia is an Equal Opportunity Employer and encourages Aboriginal and Torres Strait Islanders to apply. We also welcome applications from individuals with culturally diverse backgrounds. Saab Australia is a nationally recognised Veteran Employer of Choice that welcomes the interest of ex-service members, veterans and their families. Apply on Kit Job: kitjobau.com/job/3r2xyo
- Integrated Project Team (CSI-IPT) Collaboration Agreement (CSI-IPT CCA). The CSI-IPT CCA forms a collaborative enterprise organisation to execute scopes of work across Hobart Class Destroyer (SEA4000 Phase 6 and other related Destroyer Capability Enhancement (DCE) upgrades) and the Hunter Class Frigates (HCFs
- SEA5000 Phase 1). This will see independently executed programs such as SEA4000 Phase 6 and SEA5000 Phase 1 brought under one umbrella enterprise organisation, the CSI-IPT. The CSI-IPT will be built up with personnel from three industry participants and the Commonwealth of Australia (CoA) to form a collaborative team working across multiple programs to leverage synergies between platforms. The role As part of our Engineering and Sustainment Services group, the Lead Project Scheduler will be accountable for the effective development, update, and maintenance of the CSI-IPT Supplementary Production and Maintenance Schedules and associated performance measurement baseline. The Lead Project Scheduler will also contribute to the development and maintenance of process and policy level documentation relative to the Integrated Supplementary Schedule Environment. Further, the successful candidate will:
- Provide support, on-the-job training, mentoring, and leadership to junior scheduler(s) within the team.
- Develop and maintain the CSI-IPT Production and Test Team's Integrated Supplementary Schedule for Production, Test, and Maintenance related activities and Performance Measurement Baseline.
- Assist with the integration of the Production and Test Team's Integrated Supplementary Production and Maintenance Schedules into Project Controls and Tasking Statement Reporting Systems.
- Lead the analysis and reporting of Schedule Critical Path, Critical Activities and Milestones.
- Manage Schedule Health using CSI-IPT's schedule guidance (DCMA) and improve overall schedule health of production and test team's integrated supplementary production and maintenance schedules.
- Present reports for delivery performance, schedule adherence, resource capacity and resource utilisation.
- Responsible for the maintenance of the Production and Test Supplementary Schedules and Schedule Interfaces.
- Provide SME advice and guidance to a range of stakeholders with respect to scheduling activities.
- Support reporting activities, internal and external reviews in relation to EVM and Project Planning & Controls.
- Ensure compliance with industry standards, regulations, contract and organisational policies.
- Contribute to the continuous improvement of planning activities. Flexible work arrangements such as hybrid work from home / office and a 9-day fortnight will be considered for this role. About you Your skills and experience will include:
- Tertiary qualifications in either Project Management, Science, Business or Engineering discipline (desirable).
- Post graduate level Project Management qualifications or Cert IV Project Controls (desirable).
- Detailed understanding of PM methodologies and principles of project planning, scheduling and project controls.
- Working within a project-orientated organisation and ideally in a maintenance, production, or test environment.
- Exposure to EVM practices (desirable).
- Working in a Defence acquisition environment (desirable).
- Well-developed self-management skills and demonstrated ability to work under their own initiative to deliver outputs to time and quality.
- Team mentality is essential as they will be a requirement to lean in and assist other team members at times.
- Using PM software such as Open Plan Professional, Microsoft Project, and Cobra. Applicants must be Australian citizens and hold or be able to obtain a NV1 security clearance. Information including past and present nationality and citizenship may be requested to check eligibility for access to materials controlled under various export control regimes, including ITAR. About us Saab Australia is a defence, security and cyber solutions provider, specialising in the development and integration of major defence and security systems. For over 35 years in Australia, we have built a reputation for delivering complex systems integration projects that provide proven and advanced capabilities to keep us ahead of today's challenges. From combat, communications, security and underwater systems, to mixed reality, cyber security and deployable health solutions, our extensive portfolio of products and services provide high-technology solutions for defence forces and civil industries across the globe. Apply today to join our crew and deliver solutions with purpose! What you will be part of Explore a wealth of possibilities. Take on challenges, create smart inventions, and grow beyond. This is a place for curious minds, brave pioneers, and everyone in between. Together, we achieve the extraordinary, each bringing our unique perspectives. Your part matters. Saab is a leading defence and security company with an enduring mission, to help nations keep their people and society safe. Empowered by its 26,000 talented people, Saab constantly pushes the boundaries of technology to create a safer and more sustainable world. Saab designs, manufactures and maintains advanced systems in aeronautics, weapons, command and control, sensors and underwater systems. Saab is headquartered in Sweden. It has major operations all over the world and is part of the domestic defence capability of several nations. Read more about us here. Culture and benefits We employ over 1000 Australians and are committed to fostering a culture of excellence and enriching the employee experience. By joining Saab, you'll be a part of a collaborative and supportive organisation, where your professional growth and work-life balance are emphasised. You'll work within an innovative and vibrant workplace, while having the opportunity to develop a long-term, fulfilling career. As a valued team member of Saab Australia, you'll access a variety of perks and benefits to support you and your family including:
- 6 weeks paid leave each year
- 14% superannuation
- Free Income Protection Insurance
- Flexible working options
- Access to the Saab shares matching scheme
- Access to MySaab
- our online store offering everything from cash back at hundreds of stores to discounts from exclusive partners For further information about a career at Saab, visit the page adjacent: Applications Click 'Apply' to submit your CV and cover letter in support of your application. Kindly observe that this is an ongoing recruitment process and in exceptional circumstances, the position might be filled before the closing date of the advertisement. We encourage applications as early as possible to avoid disappointment. By submitting an application to Saab, you consent to undertaking workforce screening activities including, but not limited to, reference checks, Australian Federal Police check, verification of working rights and qualifications, sanctions screening and a pre-employment medical declaration. Saab Australia is an Equal Opportunity Employer and encourages Aboriginal and Torres Strait Islanders to apply. We also welcome applications from individuals with culturally diverse backgrounds. Saab Australia is a nationally recognised Veteran Employer of Choice that welcomes the interest of ex-service members, veterans and their families. Apply on Kit Job: kitjobau.com/job/3r2xyo
Highlights
-
Company nameSaab Australia
-
Job positionLead Project Scheduler - Defence Industry (Mawson Lakes)
Safety Tips
Be careful with commission-based ’work-from-home’ positions that offer an unrealistically high income.
More info about this ad
Lead Project Scheduler - Defence Industry (Mawson Lakes) has been posted in the Ingle Farm Construction & Manufacturing category on Locanto.
For Ingle Farm, there are no other ads posted in this category.
Interested in more? Widen your search to view ads in nearby areas of Ingle Farm. This includes Construction & Manufacturing in Enfield, Northfield and Blair Athol. There are more ads within a 15 km radius for this category. If you want to view those ads, click here.